November 10, 2023
(press release)
–
On November 10th, RYOBI MHI Graphic Technology Ltd. (President: Katsushi Hirokawa) held a completion ceremony for Plant No.3, which had been under construction at the company’s Head Office Factory. Equipped with large cranes and other equipment primarily for the assembly of large-size sheet-fed offset presses, the newly constructed Plant No.3 is a single-story building with a floor area of 4,398.98 m2. Positioned adjacent to Plant No.1 and Plant No.2, this additional facility will concentrate RMGT’s previously dispersed manufacturing operations in one location, optimizing the company’s production system and improving productivity.
* All content is copyrighted by Industry Intelligence, or the original respective author or source. You may not recirculate, redistrubte or publish the analysis and presentation included in the service without Industry Intelligence's prior written consent. Please review our terms of use.