October 9, 2024
(press release)
–
Starting Monday, October 14, all overweight trucks weighing over 80,000 pounds will be detoured around the ongoing construction on State Highway 4 (International Boulevard), in Brownsville, between I-69E and State Highway 48 (Boca Chica Boulevard). The detour route is being put in place to enhance safety on this stretch of roadway, which is currently reduced to one lane in each direction for construction. Crews are replacing the asphalt pavement with concrete pavement and upgrading the storm sewer drainage. A guided detour route will redirect overweight trucks to FM 511 throughout construction, which is expected to be completed in March of 2026. Law enforcement officers will be present to ensure compliance with the detour. Desvío de Ruta para Camiones con Sobrepeso Comenzando el 14 de octubre, 2024 Debido a obras de construcción en International Blvd. (SH 4) entre las carreteras I-69E y SH 48 (Boca Chica Blvd.), a partir del lunes 14 de octubre todos los camiones con sobrepeso que pesen más de 80,000 libras serán desviados hacia una ruta alterna para mejorar la seguridad vial en este tramo de la carretera, que actualmente se encuentra reducida a un carril en cada sentido. Las cuadrillas de TxDOT están reemplazando el pavimento de asfalto con pavimento de concreto y mejorando el drenaje del alcantarillado pluvial. La ruta alterna desviará los camiones con sobrepeso a FM 511 durante la construcción, que se espera termine en marzo de 2026. Los agentes de la ley estarán presentes para garantizar el cumplimiento del desvío de camiones con sobrepeso de International Blvd. a FM 511.
* All content is copyrighted by Industry Intelligence, or the original respective author or source. You may not recirculate, redistrubte or publish the analysis and presentation included in the service without Industry Intelligence's prior written consent. Please review our terms of use.